Please use this identifier to cite or link to this item: http://library.ediindia.ac.in:8181/xmlui//handle/123456789/4026
Full metadata record
DC FieldValueLanguage
dc.date.accessioned2016-02-17T09:04:46Z-
dc.date.available2016-02-17T09:04:46Z-
dc.date.issued1979-01-
dc.identifier.urihttp://hdl.handle.net/123456789/4026-
dc.description.abstractThe capital cost of a given plant is divided into that of the production unit proper (battery limits capital cost - BLCC) and that of the off-unit facilities (offsites capital cost) required to support the production unit, including storage, effluent treatment, laboratories, etc and a share of the general facilities such as workshops, offices and roads. The main utilities' plant such as boilers, power generation, and cooling-water towers and treatment facilities are excluded from the offsites scope as the transfer prices assumed for these utilities in the cost of production estimates cover both basic production costs and capital charges.en_US
dc.language.isoenen_US
dc.publisherUnited Nations Industrial Development Organizationen_US
dc.subjectPlant Construction Indexen_US
dc.subjectIndexen_US
dc.titlePlant Construction Indexen_US
dc.typeOtheren_US
Appears in Collections:United Nations Industrial Development Organization

Files in This Item:
File Description SizeFormat 
PLANT CONSTRUCTION INDEX.pdf
  Restricted Access
1.74 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.