Please use this identifier to cite or link to this item:
http://library.ediindia.ac.in:8181/xmlui//handle/123456789/4026
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.date.accessioned | 2016-02-17T09:04:46Z | - |
dc.date.available | 2016-02-17T09:04:46Z | - |
dc.date.issued | 1979-01 | - |
dc.identifier.uri | http://hdl.handle.net/123456789/4026 | - |
dc.description.abstract | The capital cost of a given plant is divided into that of the production unit proper (battery limits capital cost - BLCC) and that of the off-unit facilities (offsites capital cost) required to support the production unit, including storage, effluent treatment, laboratories, etc and a share of the general facilities such as workshops, offices and roads. The main utilities' plant such as boilers, power generation, and cooling-water towers and treatment facilities are excluded from the offsites scope as the transfer prices assumed for these utilities in the cost of production estimates cover both basic production costs and capital charges. | en_US |
dc.language.iso | en | en_US |
dc.publisher | United Nations Industrial Development Organization | en_US |
dc.subject | Plant Construction Index | en_US |
dc.subject | Index | en_US |
dc.title | Plant Construction Index | en_US |
dc.type | Other | en_US |
Appears in Collections: | United Nations Industrial Development Organization |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
PLANT CONSTRUCTION INDEX.pdf Restricted Access | 1.74 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.