dc.description.abstract |
The capital cost of a given plant is divided into that of the production
unit proper (battery limits capital cost - BLCC) and that of the off-unit
facilities (offsites capital cost) required to support the production unit,
including storage, effluent treatment, laboratories, etc and a share of the
general facilities such as workshops, offices and roads. The main
utilities' plant such as boilers, power generation, and cooling-water towers
and treatment facilities are excluded from the offsites scope as the
transfer prices assumed for these utilities in the cost of production
estimates cover both basic production costs and capital charges. |