Progress report of EDI-NSTEDB-STED project Roorkee pogress report

Material type: Mixed materialsMixed materialsPublisher: Ahmedabad EDII 2011 ; 2.14th April-20th April 2011 ; 3. 5th-11th May 2011 ; 4.13th-19th May 2011Description: 82pISBN: Subject(s): Programme Report | Ccompass | Magnet | Programme | Demonstration | Technical | Technical Demonstration Programme | Cluster | Industrial | Instrument | Instrument Industrial Cluster | Technological Upgradation | Survey | Assessment | Need | Need Assessment Survey | DST | Roorkee | STED | NSTEDB | EDII | EDI | Progress ReportDDC classification:
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
EDII Reports EDII Reports Ahmedabad (HO)
(Browse shelf) Available E1083

DST / NSTEDB

There are no comments on this title.

to post a comment.

Copyrights © EDII Library and Information Centre 2024. All Right Reserved

Free Hit Counter